Solutions
Eco-Friendly Solutions by Global Echo
Product 01 of 05
Flagship · Patented internal venturi
Emission Reduction
Titanium SOx scrubber designed for real-world operation
- Lead time
- 4 months from contract
- Installation
- 2 weeks at quayside, no dry-docking
- Seawater flow & pump power
- Approx. 50% lower than competitors
- Scrubber body
- Full titanium, corrosion-free
In-house sensors & debubbler
Environmental Monitoring
Stable washwater monitoring without a sampling pump
- Sampling
- Ejector type, no sampling pump required
- Internal piping
- Titanium tubing & connectors
- Measuring modules
- PAH · pH · turbidity + debubbler
- Type approval
- ABS · KR · LR · NK
CEMS-GE100 Series
Environmental Monitoring
Continuous emission monitoring of up to 5 components at once
- Components
- NOx · SO2 · CO · CO2 · O2
- Method
- NDIR (NOx · SO2 · CO · CO2) · MPA (O2)
- Calibration
- Automatic & manual (AIC)
- Interface
- Touch-panel LCD
IMO cybersecurity compliant
Emission Reduction · Control
EGCS main control system integrating operation and safety
- Configuration
- Control cabinet · remote panel · ESD panel
- ECA mode
- Automatic ECA detection & setpoint switching
- Safety
- Hardware interlock · emergency shutdown (ESD)
- Remote support
- Secure remote monitoring & control
Patented core technology
Energy Efficiency
Fuel-saving system that emulsifies water into fuel for complete combustion
- Principle
- Nano-scale emulsification of water and fuel
- Combustion
- Micro-explosions drive complete combustion
- Configuration
- Mixing unit · MS-Fuel Saver unit
- Reduces
- CO2 · PM · NOx · SOx
Why Global Echo
Field-proven technology, the competitive edge our customers choose
170+
Installations to date
16weeks
From contract to installation readiness
2years
Full-system warranty
Full turnkey process
16weeksDesign, approval & manufacturing
013D scanning
Right after contract signing, we run a feasibility review and 3D scan the existing vessel.
02Design & class approval
Our in-house team handles vessel-specific optimized design and class approval.
03Manufacturing
All equipment is ready for shipment within 4 months of contract.
2weeksInstallation & sea trial
04Quayside installation
Our own supervisors and crews handle everything from securing the quay to installation.
05Commissioning
Class-witnessed commissioning and sea trials, through to IAPP certificate renewal.
Major class
approvals
Global Service Network
Technical support,
anywhere in real time
Our service experts support you in real time through our global network, together with daily log sheet analysis and after-sales service with local partners.
- Korea · HQ
- London
- Türkiye
- Hong Kong
- Singapore
- Partner shipyards for quay & dock berths
- 16
- Partner countries across Asia, the Middle East & Europe
- 8
Contact
Planning your next retrofit?
Talk to Global Echo.
We look forward to your questions and feedback.



















