1. HOME
  2. Solutions
  3. MS-SOx

MS-SOx

Titanium SOx Scrubber (EGCS)

MS-SOx SCRUBBER

A titanium SOx scrubber proven by world-leading shipowners

Drawing on long experience in ship management and supervision, we developed MS-SOx with a full understanding of each vessel’s existing systems — to keep the scrubber workload for shipowners and crew to a minimum.

  1. 01SOx scrubber proven by world-leading shipowners
  2. 02Advanced technology
  3. 03Full turnkey provider
  4. 044-month lead time, 2-week installation without dry-docking
  5. 05Exceptional benefits for shipowners
Blue MS-SOx scrubber tower installed at a ship’s funnel

Optimized for each vessel Customized design

MS-SOx is designed from the perspective of real-world ship operation and maintenance. From the scrubber body to the seawater supply pump, every system is configured to suit the individual vessel.

3D layout of the MS-SOx system — from the scrubber body at the funnel to the seawater supply pumps in the engine room and the overboard pipes
  1. 01Scrubber body

    Rectangular titanium · internal venturi · patented

  2. 02Damper valve

    Non-sealing-air type · patented

  3. 03CEMS

    Continuous emissions monitoring system

  4. 04Main control panel

    MS-MCU · automatic ECA detection

  5. 05WMS

    Washwater monitoring · no sampling pump

  6. 06Agitator

    Dilution system · patented

  7. 07Seawater supply pump

    Approx. 50% of others’ seawater use

  8. 08Overboard pipe

    Titanium sleeve · corrosion-free

Global Echo’s core technologies

From the scrubber body to the seawater supply pump, four core technologies that reduce operating and maintenance costs.

  • Titanium scrubber body

    01 Titanium Scrubber Body

    Titanium scrubber body

    • Light, compact rectangular structure with internal venturi (patented)
    • Corrosion-free in highly acidic, high-temperature and harsh external conditions
    • Light enough to require no change to DWT or class documents
  • Damper valve and T-joint

    02 Damper Valve & T-joint

    Damper valve · T-joint

    • No sealing air required (patented · approved)
    • Special ‘T’ joint in the exhaust gas line
    • Lower OPEX and maintenance
  • Agitator and dilution system

    03 Agitator

    Agitator · dilution system

    • Dilution system with agitator (patented)
    • Discharge water at pH 6.0 or higher
    • No additional power required
  • High-efficiency seawater supply pump

    04 Sea Water Supply Pump

    High-efficiency seawater supply pump

    • Minimal seawater and power consumption compared with other systems
    • Smaller scrubbing pump and pipe sizes
    • Y-D start with constant-speed operation — no VFD required
    • Easy installation and compact layout
MS-SOx scrubber and funnel installed on a ship

Exceptional benefits for shipowners

By minimizing off-hire, operating costs and changes to class documentation, MS-SOx delivers real benefits from the moment it is installed.

  • 01

    Simple, lightweight system

    Easy operation, fewer maintenance points and low operating expenditure (OPEX)

  • 02

    Minimum off-hire

    Retrofit in just 2 weeks at the quayside without dry-docking, with no need to extend the sea chest or seawater cross lines.

  • 03

    Optimal, customized design

    No DWT change thanks to the lightweight titanium body
    No change to class documentation
    (trim & stability, firefighting, cargo loading program, EEXI, etc.)
    No large-scale hull conversion required

  • 04

    Low power consumption

    Lower fuel costs, reduced CO2 emissions and longer maintenance intervals for the auxiliary engines (A/E)

A turnkey solution from design to commissioning

16 weeks  ·  Design, approval and fabrication

  1. Reviewing a 3D scan model of an existing vessel

    01

    3D scanning · feasibility study

    A feasibility study and 3D scanning of the existing vessel begin right after contract.

  2. 3D design model of the scrubber system

    02

    Design · class approval

    Our in-house team carries out vessel-specific design and obtains class approval.

  3. Scrubber equipment ready for shipment

    03

    Fabrication · ready for delivery

    All equipment is ready for delivery within 4 months of contract.

2 weeks  ·  Installation and sea trial

  1. Installing a scrubber tower on a ship at the quayside

    04

    Quayside arrangement · installation

    Our own superintendents and work crews handle everything from arranging the quayside to installation.

  2. Workers commissioning the system in front of the control panel

    05

    Commissioning · sea trial

    Class-witnessed commissioning and a sea trial, followed by renewal of the IAPP certificate.

  • Service backed by a global network
  • One-stop support from installation to maintenance
  • In-house MCU, CEMS and WMS technology

Specifications by vessel type

Vessel type (size) Exhaust gas flow (kg/h) Scrubber size L×B×H (mm) Weight (ton) Seawater flow (m³/h) Power consumption (kW)
Chemical tanker
(50,000 DWT)
70,0002,500 × 4,000 × 7,8008200 × 260 × 2
Crude oil tanker
(158,000 DWT)
110,0005,500 × 2,000 × 7,80010250 × 270 × 2
Bulk carrier
(180,000 DWT)
150,0006,000 × 3,000 × 7,80011300 × 290 × 2
Crude oil tanker
(300,000 DWT)
200,0006,000 × 4,000 × 8,00014450 × 2125 × 2
Feeder container ship
(1,000 TEU)
60,0002,500 × 4,000 × 7,8006200 × 260 × 2
Mega container ship
(13,000 TEU)
M/E 463,000
A/E 62,000
Body 1 : 6,000 × 6,000 × 10,000
Body 2 : 4,000 × 2,000 × 7,500
23
7
800 × 2230 × 2

* Scrubber dimensions are subject to change depending on the vessel’s space restrictions. Power consumption is based on two pumps running.

MS-SOx strong points

Project scope
Full turnkey3D scanning, design, class approval and supply of the entire system; quayside arrangement, labor, installation, sea trial and IAPP certificate
Warranty
Entire system, 2 years
Scrubber tower material
Full titaniumCorrosion-free, light and compact
Venturi
Special internal venturi (patented)Simple connection
Lead time
Max. 4 months
Installation site
QuaysideArranged by Global Echo
Installation period
2 weeksBy Global Echo’s superintendents and labor
Seawater required
Approx. 50% of other systemsLower power consumption and OPEX
Pump power consumption
Approx. 50% of other systemsLower OPEX
Flow control
Y-D start, constant-speed operationSimple, easy operation on a system familiar to crew
Discharge water pH
pH 4.5 – 6.1 (dilution system)Closer to neutral with no additional power consumption, reducing the risk of damage to ship-side and hull coatings
Sealing air fan
Not requiredPatented, approved non-sealing-air damper valve
System weight (incl. piping)
25 – 40 tons in totalLightweight; no change to DWT, T&S booklet, loading manual, EEXI or class documents
Funnel structural design
Minimal change from the original designNo large-scale funnel extension; no change to DWT, firefighting system or related documents
Overboard pipe
Titanium sleeve, corrosion-free
WMS
No sampling pump; titanium tubing and connectorsEasy, stable operation

IAPP certificates · ISO certifications

  • IAPP certificate — KR (Korean Register)
    IAPP · KR
  • IAPP certificate — LR (Lloyd’s Register)
    IAPP · LR
  • IAPP certificate — DNV.GL
    IAPP · DNV.GL
  • ISO 9001:2015 certificate
    ISO 9001:2015
  • ISO 14001:2015 certificate
    ISO 14001:2015

MS-SOx, optimized
for newbuilding too

Delivering value to both shipowners and shipyards.

Even when installed within a tight schedule, it does not disrupt the shipbuilding process or design, and the shipowner benefits from the moment of delivery.

Independent external arrangement
No funnel extension required; existing drawings, class documents and sea chest remain as they are
Internal arrangement
Minimal funnel modification and a shorter exhaust gas pipe extension
  1. 01

    A more complete solution

    With minimal design approvals, the scrubber can be installed even at a late stage of construction, keeping vessel delivery on schedule. There are no extensive hull modifications and no cargo loss from increased DWT.

  2. 02

    Optimized, customized design

    The rectangular tower is ideal for external installation on vessels under construction. Titanium provides high durability against sulfuric acid, contaminants, rust and seawater.

  3. 03

    Technical advantages

    The additional DWT stays within 0.1%, so no changes to EEDI or EEXI class approvals are needed. External installation means no changes to firefighting equipment, and seawater consumption and pump power are 50% lower than competing systems.

Planning your next retrofit?
Talk to Global Echo

We look forward to hearing your comments and inquiries.